Gate Utilization
--
Target: ≥95%
Avg Walking Distance
--
Target: 25% reduction
On-Time Performance
--
Target: 15% improvement
Passenger Satisfaction
--
Target: ≥4.5/5.0
Connection Predictability
--
High Congestion Rate
--
Resource Efficiency
--
System Response
--
Passenger Throughput
--
System Availability
--
Key Performance Targets (Based on PRD)
Operational Efficiency
- • Gate Utilization: 95%+
- • Resource Efficiency: +25%
- • On-Time Performance: +15%
Passenger Experience
- • Walking Distance: -25%
- • Satisfaction Score: ≥4.5/5
- • Assistance Response: ≤10min
System Performance
- • Response Time: ≤2 seconds
- • System Uptime: ≥99.9%
- • Data Processing: 10,000+ records